Bakers Pride Oven ALF-FC Scheduled Maintenance, Daily, Weekly, Every 6 Months

Page 26

Automatic Lift Fryer

Maintenance

 

 

Maintenance

Failure to comply with the maintenance below could result in a serious accident.

Your fryer will need periodic maintenance and servicing. We strongly suggest that you use only a service company that is authorized by BKI to do this work.

Scheduled Maintenance

Use the following table to help manage scheduled maintenance activities.

FREQUENCY

PERFORMED BY

PART

ACTIVITY

 

 

 

 

Daily

User

Filter Pad

Replace filter pad. Refer to the

 

 

 

procedure in this manual.

 

User

Filter system

Filter the shortening using the

 

 

 

procedure in this manual.

Weekly

User

Fryer Pot

Perform the boil-out procedure

 

 

 

in this manual.

Every 6 Months

Authorized BKI

Connections,

Check for leakage while oil is

 

service agent

Fittings

pumping.

24

Image 26
Contents Automatic Lift Fryer Warranty Information Limited ONE Year WarrantyTable of Contents Introduction Safety PrecautionsSafety Signs and Messages Full Disconnection Specific PrecautionsEquipotential ground plane Noncombustible Floors Only Safe Work PracticesDo Not Overload The Basket With Food Keep this manual with the Equipment Be Prepared for Emergencies Safety Labels Wiring InstallationAssembly and Mounting Unpacking and HandlingInitial Test and Adjustment Controls and Indicators OperationCanceling The Stir OIL Function Pressing this button cancels Item # Description FunctionAutomatic Lift Fryer Operation Start-Up Care of the ShorteningALF-F Operation KEY Display Mode Description Cooking ALF-FC Operation System ProgrammingStep Action Display Comments Product Programming Product Programming SequenceProgram Product # Step Action Display Comments ALF and BLF AutomaticStart-Up Automatic Lift Fryer Operation Daily MaintenanceScheduled Maintenance WeeklyFiltering Procedure To refill the pot automatically, use the steps belowBoil-Out Procedure Automatic Lift Fryer Maintenance Filter Pad Replacement Slowly TroubleshootingProblem Cause Possible Solution Shortening Heating Too Filter System Not WorkingAssemblies Replacement PartsDescription Assembly # Item # QTY Description Door Assembly SB1289 Door Assembly SB1289 Parts Drain/Motor/Piping Assembly Item # QTY Description Control Panel ALF-F KNOB, S/S Strat T0075 Control Panel ALF-FC Control Panel ALF-FC Parts Oil Vat Assembly AN86202800 Quik Disconnect Bracket Weldment Components Description Component #Components Accessories Description Accessory #Storage Cover Assembly Optional Storage Cover Assembly Parts Wiring Diagrams Wiring Diagram Diagram #ALF-F 208V 3 Phase or ALF-F 240V 3 Phase ALF-F 208V/240V, 1/3 Phase ALF-FC 208V 1/3 Phase or ALF-FC 240V 1/3 Phase Sheet 1 ALF-FC 208V 1/3 Phase or ALF-FC 240V 1/3 Phase Sheet 2 ALF-FC 208V 1/3 Phase or ALF-FC 240V 1/3 Phase Sheet 3 ALF-FC 208V/240V/3 Phase sheet 1 ALF-FC 208V/240V/3 Phase sheet 2 ALF-FC 208V/240V/3 Phase sheet 3 Automatic Lift Fryer Automatic Lift Fryer Automatic Lift Fryer Automatic Lift Fryer LI0228/0808