Empire Comfort Systems pmn manual Appliance Hardware Package, Assembly of Stove Casting

Page 9

APPLIANCE HARDWARE PACKAGE

Appliance Hardware Package Parts List

Part

Part

Quantity

Description

Number

Supplied

1/42-0 x 1" Phillips Head Bolt

R-3188

4

1/4-20 x 3/8" Phillips Head Bolt

R-3646

16

1/4-20 x 1/2" Leveling Bolt

R-3747

4

No. 10 x 1/2" Hex Washer Head Screw

R-2737

10

1/4-20 Washer Head Nut

R-3185

4

Leg Pad "A" (see Figure 6)

CI-008

2

Leg Pad "B" (see Figure 6)

CI-009

2

1-1/4" x 1/2" Retaining Tab (see Figure 8)

CI-007

4

1/4" x 9/32 Washer (Not Shown)

R-1150

8

Figure 5

ASSEMBLY OF STOVE CASTING

Assembly of Stove Casting (Figures 6, 7, 8, 9, 10, 11 and 12) Attention: Included in the hardware package are (8) 1/4" inside diameter washers. A 1/4" washer may be used with a 1/4-20 x 3/8" bolt when assembling the stove casting parts. If a bolt hole is not tapped deep enough for a tight fit between stove casting parts, the 1/4" washer can be used as a shim to provide a tight fit.

The 1/4" washers are not required for assembly of the stove casting if all the bolt holes are tapped to a proper depth.

Additonal 1/4" washers are to be purchased locally.

1.Place porcelain casting pieces on a non-abrasive surface in order to protect the porcelain finish. The exterior of the porcelain casting pieces should be facing the non-abrasive surface.

2.The assembly of the casting is accomplished in 7 stages:

A.Attaching legs to the sides (Figure 6).

B.Attaching rear cover to sides (Figure 7).

C.Removing protective packaging from casting front and window (Figure 8).

D.Assembly of front by attaching retaining tabs and placing front on unit (Figure 9).

E.Inserting firebox into partially completed assembly (Figure 10 and Figure 11).

F.Attaching firebox to rear cover (Figure 12).

G.Placing top on unit.

Detailed Instructions Follow

3.Refer to Figure 6, the leg pads will have the letter "A" and "B" stamped into the metal. Place leg pad "A" and leg pad "B" at the bottom of each casting side. Leg pad "A" attaches to the front of the casting side, right and to the rear of the casting side, left. Leg pad "B" attaches to the rear of the casting side, right and to the front of the casting side, left. Position the 3/4" flange on the leg pad against the (2) locator dimples on the casting side. The 3/4" flange must be facing upward, toward the top louver openings on the casting side. Attach the two rear leg pads to the casting sides with (2) 3/8" bolts. Attach but do not completely tighten the two front leg pads to the casting sides with (2) 3/8" bolts. Attention: The front leg pads can be adjusted to provide a snug fit between the casting front and the casting sides.

4.Attach (4) leveling bolts to the bottom of the (4) legs.

15627-4-0806

Page 9

Image 9
Contents Installation Instructions Table of Contents This is a Heating Appliance Important Safety InformationLP-GAS Warning Odor Safety Information for Users of LP-GASIntroduction CIBV-30 SpecificationsGAS Supply Installing a New Main Gas CockRecommended Gas Pipe Diameter Checking Manifold PressureClearances Installation on Rugs and TileAssembly of Stove Casting Appliance Hardware PackageDetailed Instructions Follow Assembly of Stove Casting 15627-4-0806 Optional Stone Inlay Installation Installation of Optional Stone InlayParts List LOG Placement Wire Channel InstallationOperating Guidelines Vent Safety Shutoff SystemVenting VentingLiner and Insulated Liner Insulated Vent Enclosure FigureLighting Instructions For Your Safety Read Before LightingMain Burner Flame Characteristics Pilot Flame CharacteristicsAir Shutter Adjustment Cleaning the Log Set and FireboxWiring Maintenance Maintenance & Service InstructionsCleaning Procedure Glass Cleaning Glass Assembly ReplacementGeneral Glass Information Frequent pilot outage problem TroubleshootingPilot and main burner extinguish while in operation Glass sootsParts List for CIBV-30-20 HOW to Order Repair PartsParts View for CIBV-30-20 Parts List for Stove Casting Parts View for Stove Casting Installing Optional CIB-2 Blower Optional Blower Installation InstructionsRefer to Wire Channel Installation, Fan ControlWiring CleaningBlower Motor Index Part No. No. DescriptionFAX