Verona VEFSGG 365 ND warranty GAS and Electric Connection

Page 7

GAS AND ELECTRIC CONNECTION

Rif.

inch

mm

 

 

 

A

7” 15/32

190

 

 

 

B

15” 3/4

400

 

 

 

C

5” 1/8 ÷ 7” 3/32 (*)

130 ÷ 180 (*)

D

20” 1/8

511

 

 

 

* : Depending on feet regulation

Dotted line showing the position of the range when installed

Area for ELECTRICAL connection

D

 

Area for GAS connection

 

B

 

 

 

 

C

 

 

 

 

 

A

Fig. 1.2

7

Image 7
Contents Double Oven GAS Range ALL Ranges can TIP DATA PLATE Conversion Label Installation Instructions Electrical Grounding Instructions Replacement PartsProximity to Side Cabinets  installationGAS and Electric Connection Oven 305 Levelling the Cooker Fitting the Adjustable FeetMoving the Cooker Backguard or the island trim It is mandatory to installASSEMBLING THE BACKGUARD OR THE ISLAND TRIM28 15/16 735 mm Explosion Hazard Manual Shut-off Valve .1Pressure Regulator Lock Pressure Regulator InstallationImportant use two spanners to tighten the connection Page Range Manifold Manifold male Pipe fitting Flexible Connections Leak TestingRigid Pipe Connections CONVERSION TO LP/PROPANE GAS SETTING THE PRESSURE REGULATOR .5INJECTORS TABLE Operations to be Performed When Substituting InjectorsSemirapid and triple ring burners Setting the Burner MinimumOven Burner LEFT and RIGHT OVEN Adjustment of the Oven Burner MinimumRecommended ground method Electrical connectionWiring Diagram Page Page Cod ß1