Verona VEFSGE 365 ND manual Regulator cover

Page 15

STEP 3

Assemble the 1/2” NPT connector + pressure regulator group to the extension pipe interposing the gasket supplied. The regulator cover must be ordiented toward the front side of the range.

IMPORTANT: use two spanners to tighten the connection.

Regulator cover

Fig. 2.2c

STEP 4

Insert the extension pipe + pressure regulator group in the “B” bracket.

B

B

Fig. 2.2d

15

Image 15
Contents Double Oven Dual Fuel Range ALL Ranges can TIP DATA PLATE Conversion Label Installation Instructions Electrical Grounding Instructions Replacement PartsProximity to Side Cabinets  installationGAS and Electric Connection Oven Vent 305 Fitting the Adjustable Feet Levelling the CookerMoving the Cooker OR THE ISLAND TRIM ASSEMBLING THE BACKGUARD2631/32685 mm ANTI-TIP Stability Device Installation InstructionsGas connection Lock Pressure Regulator InstallationRegulator cover Page Range Manifold Flexible Connections SETTING THE PRESSURE REGULATOR .5 INJECTORS TABLE Operations to be Performed When Substituting InjectorsSemirapid and triple ring burners Setting the Burner MinimumElectrical Connection with Power Cord Electrical RequirementsElectrical Connection with Conduit Wire Power Cord Installation Wire Conduit Installation Electric Diagram KEY Wiring DiagramPage Page Cod ß1