Verona VEFSGE 365 ND manual

Page 16

STEP 5

Assemble the extension pipe + pressure regulator group to the range manifold interposing the gasket supplied. The regulator cover must be ordiented toward the front side of the range.

IMPORTANT: use two spanners to tighten the connection.

Fig. 2.2e

16

STEP 6

Fix the “C” bracket on the back of the range by the 2 (two) screws supplied with the kit for gas connection.

The regulator cover must be ordiented toward the front side of the range.

C

Fig. 2.2f

Image 16
Contents Double Oven Dual Fuel Range ALL Ranges can TIP DATA PLATE Conversion Label Installation Instructions Replacement Parts Electrical Grounding Instructions installation Proximity to Side CabinetsGAS and Electric Connection Oven Vent 305 Levelling the Cooker Fitting the Adjustable FeetMoving the Cooker ASSEMBLING THE BACKGUARD OR THE ISLAND TRIMANTI-TIP Stability Device Installation Instructions 2631/32685 mmGas connection Pressure Regulator Installation LockRegulator cover Page Range Manifold Flexible Connections SETTING THE PRESSURE REGULATOR .5 Operations to be Performed When Substituting Injectors INJECTORS TABLESetting the Burner Minimum Semirapid and triple ring burnersElectrical Requirements Electrical Connection with Power CordElectrical Connection with Conduit Wire Power Cord Installation Wire Conduit Installation Wiring Diagram Electric Diagram KEYPage Page Cod ß1