Figure 2-17. Utility Connection Locations for Gas Ovens
fitting
| Gas Inlet |
Electrical Junction Box | (One per Single, Double, |
(One per oven cavity) | or Triple Oven) |
on the oven serial plate. The location of the serial plate is shown in Figure
A fused disconnect switch or a main circuit breaker (customer furnished) MUST be installed in the electric supply line for each oven cavity. It is recommended that the switch/circuit breaker have Lockout/Tagout capability.
The supply conductors must be of the size and material (copper) recommended. Refer to the wiring diagram inside the machinery compartment of the oven. Electrical specifications are also listed on the oven’s serial plate and in Table
The oven requires a ground connection to the oven ground screw. For gas ovens, the screw is located in the electrical junction box (see Figure
Incoming electrical power lines are fed through the
Connection
Refer to the wiring diagram inside the machinery compartment of the oven to determine the correct connections for the electrical supply lines. Connect the supply as indicated on the wiring diagram.
CAUTION: The terms of the oven’s warranty require all
VII. GAS SUPPLY
CAUTION: DURING PRESSURE TESTING NOTE ONE OF THE FOLLOWING:
1.The oven and its individual shutoff valve must be discon- nected from the gas supply piping system during any pressure testing of that system at test pressure in excess of ½ psi (3.45 kPa).
2.The oven must be isolated from the gas supply piping system by closing its individual manual shutoff valve during any pressure testing of the gas supply piping system at test pressure equal to or less than ½ psi (3.45 kPa).
3.If incoming pressure is over 14″ W.C. (35mbar), a separate regulator MUST be installed in the line BE- FORE the individual shutoff valve for the oven.
WARNING: To prevent damage to the control valve regu- lator during initial
After the initial gas
A. Gas Utility Rough-In Recommendations
The following gas system specifications are STRONGLY RECOMMENDED. Deviating from these recommendations may affect the baking performance of the oven.
Gas Meter
•One or two cavities: 750 cfh meter
•Three oven cavities: 1200 cfh meter
Gas Line
•DEDICATED LINE from the gas meter to the oven
•2″ (50.8mm) pipe for natural gas
•2″ (50.8mm) pipe for propane
•Maximum length: 2002 (61m). Each 90°elbow equals 7″ (2.13m) of pipe.
13