GE Monogram ZCG3300, ZCG3500, ZCG3100 Procedure D Thick wood panel with custom handle

Page 14

Installation

Built-In Compactors

Procedure D

3/4" thick wood panel with custom handle

• Pull the drawer out to stop position.

Unlatch the drawer front by opening the clasp on the right side.

While supporting the weight of the drawer front, remove the hinge pins on the left side.

Lay drawer front face down on a flat surface.

Remove 9 screws which retain the front panel and handle.

Save galvanized inner door.

Discard front panel with side trim and handle.

Place galvanized inner door onto the back side of the finished panel.

Position the inner door 1-5/16" below the top of the finished panel and center, left to right.

Use the inner door as a template. Drill 2 pilot holes near the top and 2 at the bottom, sized to match screws being used. (Screws are not provided)

Drive 2 screws loosely into the bottom and 2 screw into the top. Check to be sure the inner door is centered left to right over the finished panel. Tighten screws.

Caution: Select screw length carefully to avoid penetration of the finished side.

C

L

1-5/16"

Back Side Finished Panel

Galvanized Inner Door

C

L

Back Side Finished Panel

Galvanized Inner Door

14

Image 14
Contents Installation Instructions Mise EN Garde Design Information Installation Preparation Thick Wood PanelOption #3 Thick Wood Panel with custom handleInstallation Installation in a corner Level the opening Determine toekick depth Adjust movable base Positioning the compactor backstop Setting the height Attach tip-over brackets Step Optional custom toekick Procedure C Thick wood panel with supplied handle Procedure a Reverse color panelProcedure B Thick wood panel Procedure C Procedure D Thick wood panel with custom handle Procedure D Pub. No Dwg. No D4700P196 93042835C