GE Monogram ZCG3300, ZCG3500, ZCG3100 Determine toekick depth Adjust movable base

Page 8

Step 1 Determine toekick depth

Step 2 Adjust movable base

Installation

Built-In Compactors

Place a section of the carton on the floor for protection. Lay the compactor on its back, supporting it with a piece of wood to prevent pressure on the power cord.

Measure the toekick of an adjacent cabinet, from the front of the cabinet door to the front of the toekick (Dimension A).

Note: If a custom toekick board is used, its thickness must be accounted for in dimension “A”. See step 6.

With the compactor laying on its back, locate the six Phillips head screws on the bottom, positioned inside of the movable base.

Loosen these six screws. Slide base to set dimensions “A” as shown.

Tighten screws making sure base does not move.

Note: If an alternate toekick depth dimension is required, follow the procedure above and adjust the base accordingly. The base can be adjusted from 2-3/4" to 4-1/4" from the compactor front panel.

8

Image 8
Contents Installation Instructions Mise EN Garde Design Information Installation Preparation Thick Wood PanelOption #3 Thick Wood Panel with custom handleInstallation Installation in a corner Level the opening Determine toekick depth Adjust movable base Positioning the compactor backstop Setting the height Attach tip-over brackets Step Optional custom toekick Procedure C Thick wood panel with supplied handle Procedure a Reverse color panelProcedure B Thick wood panel Procedure C Procedure D Thick wood panel with custom handle Procedure D Pub. No Dwg. No D4700P196 93042835C