Middleby Cooking Systems Group PS520E operation manual Attaching Drive Chain

Page 30

SECTION 4 MAINTENANCE

6. Reconnecting the inside master links (Figure 4-29)

H. Attaching Drive Chain

1.If drive sprocket assembly was removed, reassemble it onto the conveyor drive shaft. Be sure flat on end of drive shaft aligns with set screw in conveyor shaft collar. Once in place tighten 3/32” set screw.

2.Lift conveyor and install drive chain to conveyor drive sprocket and motor sprocket.

Figure 4-29

NOTE: The outside master links have right and left sides to them. The right edge master link has an open hook facing you as shown in Figure 4-30. This will match up with the outer edges of the conveyor belt. Remember this hook travels backwards on the conveyor.

Figure 4-32

3. The angle plate located on the underside of the conveyor must be against the lower end plug. This is true on both sides of the oven.

Figure 4-30

7.Reconnect the outside master links.

8.Replace all parts removed from the oven.

Crumb Pan

Mounting Bracket

Lower End Plug

Figure 4-33

Figure 4-31

26

Image 30
Contents Installation Page A. Only IiiTable of Contents Section Description Model IdentificationPS520 Series Oven Specifications This Manual Must Be Kept For Future ReferenceII. Component Function Section Installation UnloadingInstallation KIT Single and Double Stack OvensModel PS520 Single Oven Dimensions II. Ventilation IV. Electric Supply for Electrically Heated Ovens 11. Junction Connection BoxSection Operation Control FunctionsHeat Switch Door Safety SwitchBlower Switch Temperature ControllerMeasuring Conveyor Speed ConveyorSee -4 Shutdown Procedure Start-up Procedure Daily Start-upPower Failure III. STEP-BY-STEP OperationDaily Start-up Procedure Daily Shutdown ProcedureIV. Normal Operation STEP-BY-STEP Overtemp Quick Reference Troubleshooting SymptomSection Maintenance Important Note Maintenance DailyExterior Conveyor Belt FigureRemoving Conveyor From Oven For Cleaning II. Maintenance MonthlyPrecautions Part#QuantitySection Maintenance Air Fingers Disassembly For cleaning Standard FingersReassembly of Air Fingers 12. Standard Lower FingerExtended Lip Tab on Outer Plate Flange Finger Manifold Reinstall End Plugs Conveyor Reassembly Into Oven Checking Conveyor Belt TensionConveyor Belt Link Removal Attaching Drive Chain Electrical Terminals III. Maintenance Every 3 MonthsIV. Maintenance Every 6 Months VentilationPS520-SERIES Electric Oven KEY Spare Parts KIT Description QuantitySection Troubleshooting E208-240V 50/60/1 E380-480V 50/60/1 E230-240V CE, 1Ph E380-400V CE, 1Ph E380-400V CE, 3Ph