Desa Tech CDVBPC, CDVBNC manual REMOVING/REPLACING Glass Door, Installing Remote Receiver

Page 21

STOVE AND DIRECT-VENT BURNER SYSTEM INSTALLATION

Installing Optional Wireless Hand-held Remote Control Accessories - CGHRC and CGHRCTA Series Removing/Replacing Glass Door

21

STOVE AND DIRECT-VENT BURNER SYSTEM INSTALLATION

Continued

INSTALLING OPTIONAL WIRELESS HAND- HELD REMOTE CONTROL ACCESSORIES - CGHRC AND CGHRCTA SERIES

Installing Remote Receiver

1.Open bottom door on stove body and locate the switch plate on the left of the valve bracket.

2.Unscrew switch plate (see Figure 43).

3.Disconnect wires from THTP and TH on control valve that lead to the switch (see Figure 44). Discard switch plate, screws, and nuts.

4.Install battery into receiver battery clip and connect to termi- nals (see Figure 45).

5.Place receiver into valve bracket and align holes (see Figure 46).

6.Use push-in fasteners included with receiver to secure to bracket.

7.Connect the wires from the receiver to the valve at TH and THTP (see Figure 44).

Figure 46 - Installing Remote Receiver

Installing 9-Volt Battery in Hand-Held Remote Control Unit

1.Remove battery cover on back of remote control unit

2.Attach terminal wires to a 9-volt battery (not included). Place battery into the battery housing.

3.Replace battery cover onto remote control unit.

 

Terminal

 

Remote

9-Volt

Battery Cover

Control

Wires

Unit

Battery

 

 

 

Battery Housing

Figure 43 - Removing Switch Plate

To Control

Switch or

Optional

Accessory

TPTH TP TH

Figure 44 - Control Valve Terminals

Receiver

9-Volt

Terminal

Battery

Wires

Battery

Clip

Figure 47 - Installing Battery in Hand-Held Remote Control Unit

REMOVING/REPLACING GLASS DOOR

You must remove glass door to install logs, lava rock, and ember material. To remove glass door, you must first remove the front panel on stove body.

CAUTION: Do not operate this burner system with a broken glass door panel or without the glass door panel securely in place. For replacement part infor- mation see Replacement Parts, page 31.

1.Remove 2 bolts from bottom of stove and one from the top of stove to remove front panel (see Figure 48, page 22).

2.Remove the screws from the 2 tabs at the top of the glass door while holding door securely keeping it from falling forward.

3.Grasp door by both sides and ease it upward off of the lower bracket (see Figure 49, page 22).

4.To replace glass door, follow the above instructions in reverse.

Figure 45 - Installing Battery in Receiver

For morevisit www..com

105501-01G

Image 21
Contents OWNER’S Operation and Installation Manual For Your SafetyFor Your Safety What to do if YOU Smell GAS Safety Information Table of ContentsCleaning stove or burner system Safety Information Product IdentificationPRE-INSTALLATION Preparation Product FeaturesLocal Codes Glossary of TermsClearances for Standard Installation Stove Body Assembly Cast Iron Stove and DIRECT-VENT Burner System AssemblyAttaching Stove Door Installing DIRECT-VENT Burner System Into Stove BodyInstalling GA3750/CDA3620T Blowers Installing Optional Blower AccessoryInstalling Rear Cover General VentingLocation of Vent Termination General Venting Venting Installation Installation PrecautionsInstallation Planning Installing Vent System in a Chase Installation for Horizontal TerminationVent Pipe Connections Horizontal Termination Configuration for Rigid Venting Horizontal Termination ConfigurationsFlat Ceiling Installation Installation for Vertical TerminationVertical Termination Configurations Cathedral Ceiling InstallationParts Lists for Venting Kits and Components High Altitude InstallationInstalling GAS Piping to STOVE/ Burner System Location Stove and DIRECT-VENT Burner System InstallationInstallation Items Needed Check GAS TypeConnecting STOVE/BURNER System to GAS Supply Pressure Testing Gas Supply Piping SystemChecking GAS Connections Turn off burner system see To Turn Off Gas to Appliance, Pressure Testing Burner System Gas ConnectionsInstalling Remote Receiver Installing 9-Volt Battery in Hand-Held Remote Control UnitREMOVING/REPLACING Glass Door Removing Front Panel from Stove Installing LOGS, Lava Rock and Glowing EmbersFor Your Safety Read Before Lighting Operating Stove with Burner SystemLighting Instructions To Turn OFF GAS To Appliance Manual Lighting ProcedureOptional Remote Operation Shutting Off Burners Only pilot stays litOperating Optional Blower Accessory Cghrc Series OperationCghrcta Series Operation Inspecting Burners Pilot AssemblyOperating Optional GWMT1 Wall Mounted Thermostat Burner Flame PatternGlass Door Cleaning MaintenancePilot and Burners LogsObserved Problem Possible Cause TroubleshootingObserved Problem Possible Cause Remedy Gas leak. See Warning statement Replacement Parts Wiring DiagramSpecifications Parts Under WarrantyModels Cdvbnc and Cdvbpc Illustrated Parts BreakdownKEY Part Number Description QTY Parts ListStove Chassis Models Cisc and Cisg KEY Part Description QTY Models Cisc and CisgTechnical Service Service HintsAccessories Owners Registration Form Postage Required 105501-01G Warranty Information