Kohler 12RESM1 manual Dsai Connection

Page 21

Procedure to Convert from NG to LP

1.Place the generator set master switch in the OFF position.

2.Disconnect the power to the battery charger.

3.Disconnect the generator set engine starting battery, negative (--) lead first.

4.Turn off the fuel supply.

5.Remove the hose clamp and fuel hose from the hose fitting. See Figure 1-15.

1

2

3

4

Fuel System Detail

5

2

6

 

 

3

4

GM51561A-D

1.Hose fitting (LP orifice fits inside; see Figure 1-16)

2.Regulator

3.Fuel valve

4.Fuel inlet, 1/2 in. NPT female

5.Fuel hose with clamp

6.DSAI connector location (see Figure 1-18)

Figure 1-15 Fuel System Components, Air Inlet Side, 17/18 kW Shown

6.Place the orifice into the hose fitting. See Figure 1-16.

12

3

tp6514

1. LP orifice

2. Hose fitting

3. Regulator

Figure 1-16 LP Fuel Orifice Installation

7.Slide the hose onto the hose fitting and secure it with the clamp.

8.Disconnect the digital spark-advance module (DSAI) leads for LP. (Connect the leads for natural gas.) See Figure 1-17 and Figure 1-18.

Fuel

DSAI Leads

 

 

Natural Gas

Connect

 

 

LP

Disconnect

Figure 1-17 DSAI Connection

1

tp6514

1.DSAI leads 65 and N5: connect for natural gas, disconnect for LP

Figure 1-18 Digital Spark Advance (DSAI) Leads (located in generator set air intake area)

TP-6516 4/09

Section 1 Installation 21

Image 21
Contents Models Controller DC-RET Digital ControlTP-6516 4/09d Generator Set Identification Numbers Product Identification InformationEngine Identification Controller IdentificationTable of Contents TP-6516 4/09 Safety Precautions and Instructions BatteryAccidental Starting Engine Backfire/Flash Fire Exhaust SystemFuel System Hazardous Noise Hazardous Voltage/ Moving PartsHeavy Equipment Hot Parts Detail IntroductionGenerator Set Component Locations, 17/18 kW Models Service Assistance TP-6516 4/09 General InstallationLifting Generator Set InspectionSee Section Generator Set Clearances, 12 kW Models, ADV-7466, Sheet Installation TP-6516 4/09 Generator Set Clearances, 17/18 kW Models, ADV-7341-B, Sheet Power Supply Exhaust RequirementsAir Requirements Fuel Supply Fuel RequirementsFuel Conversion Fuel Pipe SizeFuel Conversion 17 Dsai Connection AC Connections Electrical ConnectionsBattery Charger Remote Start ConnectionGrounding EZ-273000-J Engine starting battery location 24 Carburetor Heater, 17/18 kW Carburetor Heater optionalStartup Notification Prestart Installation CheckInstallation TP-6516 4/09 Wiring Diagrams and Schematics Wiring DiagramsSchematic Diagram, 12 kW Models, ADV-7351 Point-to-Point Wiring Diagram, 12 kW Models, GM52471 Schematic Diagram, Single Phase, 17/18 kW Models, ADV-7353 TP-6516 4/09 Wiring Diagrams Wiring Diagrams TP-6516 4/09 Ansi Appendix a AbbreviationsLCB TP-6516 4/09 TP-6516 4/09 Page 2007, 2008, 2009 by Kohler Co. All rights reserved