STEP 6
TOWERS AND DOORS INSTALLATION
Place cement board or equivalent on top of shower base flange and over side wall post flat then secure to studwall. Apply tile (or other finishing material) leaving a 1/8" gap between the finishing material and the shower base flange lip. Leave a 1/8" gap between the finishing material and the side wall post flange. Seal the gaps with silicone sealant. Leave a minimum 1/4" gap at the back and front corners of the shower base to allow drainage from leakage through unsealed tiled grout. See Shim Instructions on page 6.
|
|
|
| TILE | STUD OR |
|
|
| TILE |
| |
| STUD |
| BLOCKING | ||
| CEMENT |
| |||
|
|
| |||
|
|
|
|
| |
|
| CAULKING | BOARD |
| CEMENT BOARD |
|
|
| TILE |
|
|
FLANGE | ADHESIVE |
| TILE ADHESIVE | ||
STUD |
|
| |||
|
|
| CAULKING |
| |
|
|
|
|
| |
|
|
| ATTACH WITH |
|
|
SHIM IF |
|
| SCREWS PROVIDED | 1/8" GAP |
|
NECESSARY |
|
|
|
| |
| 1/8" GAP |
| BETWEEN |
| |
TO FILL GAPS |
|
|
| ||
| BETWEEN |
| BASE & |
| |
BETWEEN STUD |
|
| |||
BASE & | DO NOT FILL | TILE |
| ||
AND FLANGE |
|
|
| ||
| TILE | THIS AREA |
|
| |
|
|
| WATER TOWER | ||
|
|
|
|
| |
|
|
|
| DO NOT FILL |
|
|
|
|
| THIS AREA |
|
|
|
|
| SIDE WALL POST | SIDE JAMB |
STEP 7
Filling the area marked DO NOT FILL will prevent moisture from properly draining back into the base through weep holes. This moisture is due to leakage through the tile grout. Sealing the tile grout will reduce or prevent this leakage.
CEMENT
BOARD
STUD
SHIM IF NECESSARY
DO NOT FILL
TILE
GROUT
SILICONE
SEALANT
SHOWER
BASE
TILE | CEMENT BOARD |
| |
| TILE ADHESIVE |
DO NOT FILL |
|
THIS AREA |
|
| STUD OR BLOCKING |
| SIDE WALL POST |
| SIDE JAMB |
STEP 8
NOTE: ALLOW 24 HOURS DRYING TIME BEFORE CONTINUING THE TOWERS AND DOORS INSTALLATION.
10
Jacuzzi Whirlpool Bath© BZ00000 03/05