TOWERS AND DOORS INSTALLATION
THESE INSTRUCTIONS ARE FOR SUMMER RAIN II 2 WALL AND 3 WALL UNITS WITH AND WITHOUT AIR FEATURE OPTION.
Refer to COMPONENT IDENTIFICATION on page 4 to help identify parts.
STEP 1
On the 2 wall unit attach the wall jamb to the water tower adjacent to the side wall. Then insert the wall post into the wall jamb. Do not screw jamb and post together at this time. Position each tower on mounting pad on base.
For the water towers, feed hot and cold supply line through appropriate holes in bottom of tower. For air feature, feed air line through large hole on bottom cap of the air tower. Check with a level when attaching towers to base. Tighten tower base bolts after leveling (1 bolt per shower tower and 2 bolts for air tower).
JAMB AND
WALL POST
WATER TOWER DETAIL
FLOW
SWITCH
CABLE*
BOLT (5/16")
WASHER
SHOWER
TOWER (2X)
COLDHOT
* ONLY WITH AIR TOWER UNITS
STEP 2 (WITH AIR FEATURE ONLY)
Route control panel cable up through air tower and connect to control panel.
CONTROL
PANEL CABLE
BOLT 5/16" (2)
WASHER (2)
|
|
| AIR | |
AIR SU | PPY | PIPE | ||
TOWER |
BLACK LEAD
REAR OF CONTROLLER
STEP 3 (WITH AIR FEATURE ONLY)
Route flow switch cables up through water towers and connect to flow switch on both shower towers.
FLOW
SWITCH
FROM
CONTROL
BOX
8
Jacuzzi Whirlpool Bath© BZ00000 03/05