Jacuzzi BZ00000 operating instructions Side Rail 2 Wall only

Page 13

TOWERS AND DOORS INSTALLATION

STEP 9 (2 WALL ONLY)

Place the side support rail into the slot on the water tower. Place the short wall rail into the slot on the other water tower. Rotate flat end of short wall rail flush to wall. With rails in position install hold down brackets, but do not tighten screws. Check water towers for level. Check side support rail for level and mark on the finished wall where to attach rail bracket. See DETAIL A. Drill 3/16" hole and secure bracket/short wall rail with screws and wall anchors provided. Slide cover cap over rail bracket. If a tower bolt was loosened, retighten while checking the plumb of the tower. Tighten screws on all hold down brackets.

STEP 9 (3 WALL ONLY)

Place the short wall rails into the slot on each water tower. Rotate flat end of short wall rails flush to wall. With rails in position install hold down brackets, but do not tighten screws. Check water towers and short wall rails for level. Drill 3/16" hole and secure short wall rails to wall with screws and wall anchors provided. If a tower bolt was loosened, retighten while checking the plumb of the tower. Tighten screws on all hold down brackets.

SIDE RAIL (2 WALL ONLY)

SIDE RAIL COVER BRACKET (2 WALL ONLY)

RAIL BRACKET

ATTACH RAIL

 

 

BRACKET TO WALL

HOLD DOWN BRACKET

 

COVER CAP

SECURE RAIL TO

 

BRACKET (TURN CW

 

TO TIGHTEN)

CENTER SUPPORT RAIL

 

SIDE RAIL

 

WATER TOWER

 

DOOR POST

 

WATER TOWER JAMB

 

 

MOVE COVER CAP

 

OVER BRACKET

 

DETAIL A

SHORT WALL RAIL (2 WALL AND 3 WALL)

FLAT END

FLUSH TO WALL

SHORT RAIL

(1 RAIL WITH 2 WALL) (2 RAILS WITH 3 WALL)

SHORT WALL RAIL MOUNTING

DRILL 3/16" HOLE

ATTACH RAIL

BRACKET TO WALL

11

Jacuzzi Whirlpool Bath© BZ00000 03/05

Image 13
Contents Summer Rain Person Shower System TWO Wall and Three Wall Important Safety Information Contents Dimensions SpecificationsTotal WEIGHT/FLOOR Loading ROUGH-IN Reference Front View Side View Component IdentificationInstallation Instructions Step Base InstallationPreliminary ROUGH-IN StepShim Instructions Flow Switch Control CABLE* PanelClean UP After Base Installation With AIR Feature only Towers and Doors InstallationWater Tower Detail Hold Down Bracket Detail Do not Fill Side Rail 2 Wall only Wall onlyAttach air supply pipe to air tower plumbing Shower Base Slide fixed glass panel all the way into wall post Tower and Door Installation Towers and Door Installation Clean UP After Towers and Door Installation Operation Shower TowersController AIR Tower ControlsMaintenance Tower Fixtures Repair Parts TOWER, 2 Person Shower Tower Plumbing Repair PartsJacuzzi Whirlpool Bath BZ00000 03/05 Jacuzzi Whirlpool Bath National Headquarters Jacuzzi Whirlpool Bath Warranty Registration Card