TOWERS AND DOORS INSTALLATION
STEP 10
Two
SHUT OFF VALVES (PROVIDED)
COLD HOT
CAULK AROUND SUPPLY
PIPING AND INSIDE TOWER BASE
STEP 11 (WITH AIR FEATURE ONLY)
Attach air supply pipe to air tower plumbing.
12
Jacuzzi Whirlpool Bath© BZ00000 03/05
Two
SHUT OFF VALVES (PROVIDED)
COLD HOT
CAULK AROUND SUPPLY
PIPING AND INSIDE TOWER BASE
12
Jacuzzi Whirlpool Bath© BZ00000 03/05