TOWERS AND DOORS INSTALLATION

STEP 10

Two shut-off valves are provided per water tower. To hook up supply lines, unscrew valves from braided line. Using thread sealant, screw each valve to stub out at bottom of tower. Then reconnect braided line using provided gasket. Do not twist or kink supply lines when connecting. Perform this step for both water towers.

SHUT OFF VALVES (PROVIDED)

COLD HOT

CAULK AROUND SUPPLY

PIPING AND INSIDE TOWER BASE

STEP 11 (WITH AIR FEATURE ONLY)

Attach air supply pipe to air tower plumbing.

12

Jacuzzi Whirlpool Bath© BZ00000 03/05

Image 14
Contents Summer Rain Person Shower System TWO Wall and Three Wall Important Safety Information Contents Total WEIGHT/FLOOR Loading SpecificationsDimensions ROUGH-IN Reference Component Identification Front View Side ViewPreliminary ROUGH-IN Base InstallationInstallation Instructions Step StepFlow Switch Control CABLE* Panel Shim InstructionsClean UP After Base Installation Water Tower Detail Towers and Doors InstallationWith AIR Feature only Hold Down Bracket Detail Do not Fill Wall only Side Rail 2 Wall onlyAttach air supply pipe to air tower plumbing Shower Base Slide fixed glass panel all the way into wall post Tower and Door Installation Towers and Door Installation Clean UP After Towers and Door Installation Shower Towers OperationAIR Tower Controls ControllerMaintenance Tower Fixtures Repair Parts Tower Plumbing Repair Parts TOWER, 2 Person ShowerJacuzzi Whirlpool Bath BZ00000 03/05 Jacuzzi Whirlpool Bath National Headquarters Jacuzzi Whirlpool Bath Warranty Registration Card