Jacuzzi J-ALLURELuxury Bathing and Entertainment System manual Fixed Panels Installation

Page 16

J-Allure

Fixed Panels Installation

Locate the guide with the gasket. This is the lower guide. Remove this gasket and install on the top guide. Position the lower guide on the two fixed panels while they are resting on the floor in an upside down position. Align the predrilled holes in the guide and panels and screw together with screws and spacers (3.5x45mm self-threading). Attach the external extrusion of the panels to the guide with 4.2x19mm self-threading screws. The right and left hand fixed panels are identified by the logo.

Invert the assembled components and install the upper guide following the same procedure as used with the lower guide. Caulk the top of each fixed panel.

SCREWS WITH SPACERS (4)

UPPER GUIDE

SEALANT

LOGO

SCREWS (8) (4.2x19mm)

SEALANT

SEALANT

LOWER

GUIDE

REMOVE

GASKET

14

Image 16
Contents Allure Important Safety Information Contents Specifications AllureHardware Typical Installation Framing and SupportRough-in Finished Walls Suggested Rough-in Plumbing for Center Panel Skirt Installation Service Access Bath Electrical ConnectionsDrain Information PlumbingWater Supply Clean-Up After InstallationHot and Cold Supply Valve & Fill Spout Locations Center Panel Installation Allure TV Installation Units with TV Drip Shield Wiring TV ConnectionsFixed Panels Installation Wall Extrusion Fixed Panel Assembly Side Walls Installation Side Walls Caulking Inside Caulking Sliding Doors Installation Dome Installation Center Panel Starting Any FunctionMixer Control Hand Held ShowerMagic Touch Whirlpool Switch Starting the HydromassageStarting the Steam Bath Bath OperationControlling Whirlpool Action CD/RADIOCenter Panel Maintenance Bath MaintenanceSuction Cover/Strainer Maintenance Dome CleaningCare and Maintenance of Steampro Steam Generators Jacuzzi Whirlpool Bath National Headquarters Page Jacuzzi Whirlpool Bath Responsibilities of Others