Jacuzzi J-ALLURELuxury Bathing and Entertainment System manual Finished Walls

Page 8

J-Allure

Finished Walls

Before fixing the bath in place, make sure the finished walls above the rim of the bath are perpendicular. The two wall extrusions at the edges of the fixed panels will allow some compensation for walls out of true less than 3/16". (See fixed panels installation for wall extrusions.) If that is the case, the bath may be placed against the finished walls. If more than 3/16", shims will be necessary and the bath moved away from the wall an appropriate distance. When final setting of the bath, secure the metal straps attached to the bath to the floor with screws or anchors.

SHIM

 

WALL EXTRUSION

WALL EXTRUSION

FINISHED WALL

FINISHED WALL

90°

90°

SHIM

SHIM

38"

4-1/2"

FINISHED

WALL

Wall Cutouts

FACE OF

FINISHED

WALL

12"

38"

4-1/2"

FINISHED

WALL

6

Image 8
Contents Allure Important Safety Information Contents Specifications AllureHardware Typical Installation Framing and SupportRough-in Finished Walls Suggested Rough-in Plumbing for Center Panel Skirt Installation Service Access Bath Electrical ConnectionsDrain Information PlumbingHot and Cold Supply Valve & Fill Spout Locations Clean-Up After InstallationWater Supply Center Panel Installation Allure TV Installation Units with TV Drip Shield Wiring TV ConnectionsFixed Panels Installation Wall Extrusion Fixed Panel Assembly Side Walls Installation Side Walls Caulking Inside Caulking Sliding Doors Installation Dome Installation Center Panel Starting Any FunctionMixer Control Hand Held ShowerMagic Touch Whirlpool Switch Starting the HydromassageStarting the Steam Bath Bath OperationControlling Whirlpool Action CD/RADIOCenter Panel Maintenance Bath MaintenanceSuction Cover/Strainer Maintenance Dome CleaningCare and Maintenance of Steampro Steam Generators Jacuzzi Whirlpool Bath National Headquarters Page Jacuzzi Whirlpool Bath Responsibilities of Others