Jacuzzi J-ALLURELuxury Bathing and Entertainment System manual Rough-in

Page 7

J-Allure

Rough-in

The installation requires three cutouts in the walls. Two cutouts allow room for the speakers. The third cutout is necessary to route water supply piping to the center panel, and to route hoses for the steam generators to the bath. The location of a 230VAC power outlet is indicated on the wall cutouts illustration.

Rough-in Reference

 

 

 

51

54"

 

 

 

-

 

 

 

35

3/16"

54"

 

-

 

 

-3/16"

3/8"

40"

 

 

51

 

 

 

15" x 5"

DRAIN/OVERFLOW CUTOUT IN FLOOR

72-7/16"

4-3/8"

-3/4" 13

5

Image 7
Contents Allure Important Safety Information Contents Allure SpecificationsHardware Framing and Support Typical InstallationRough-in Finished Walls Suggested Rough-in Plumbing for Center Panel Skirt Installation Plumbing Service AccessBath Electrical Connections Drain InformationWater Supply Clean-Up After InstallationHot and Cold Supply Valve & Fill Spout Locations Center Panel Installation Allure Drip Shield Wiring TV Connections TV Installation Units with TVFixed Panels Installation Wall Extrusion Fixed Panel Assembly Side Walls Installation Side Walls Caulking Inside Caulking Sliding Doors Installation Dome Installation Hand Held Shower Center PanelStarting Any Function Mixer ControlBath Operation Magic Touch Whirlpool SwitchStarting the Hydromassage Starting the Steam BathCD/RADIO Controlling Whirlpool ActionBath Maintenance Center Panel MaintenanceDome Cleaning Suction Cover/Strainer MaintenanceCare and Maintenance of Steampro Steam Generators Jacuzzi Whirlpool Bath National Headquarters Page Jacuzzi Whirlpool Bath Responsibilities of Others