J-Allure
Sliding Doors Installation
Take one of the doors inside the shower compartment. The upper rollers will be fixed while the bottom rollers will be loose. In a vertical position, insert the upper and lower rollers (at the same time) into the roller insertion point located at the center of the upper and lower guide. Slide the door toward the wall. Insert the remaining set of rollers. Making sure the bottom rollers are positioned in the bottom guide channel, lift them up and tighten the locking nuts. Confirm that the door slides smoothly without binding. Slide the door toward the wall and repeat the above steps for the other door. Adjust lower and upper rollers to align doors where they meet each other when closed. Insert the four M5 stud screws and M5 acorn nuts (door stops) into the threaded holes in the upper guide and tighten them.
ROLLER
INSERTION
POINTROLLER
CHANNEL
DOOR STOP
STUD SCREWS
AND ACORN NUTS
ROLLER ROLLER
INSERTION CHANNEL
POINT
19