OPERATING INSTRUCTIONS
LOADING
. | . |
As bucket beginsto fill with material, gradually roll the bucket back and raise the loader to increase ”fill”capacity. This procedure also resultsinthe materialbeing removedin layers from the top for maximum loading efficiency.
When thle bucket is full, raise loade!r so that the bucket isclear of materialand slowly back out of pile.
For maximum loading efficiency, minimize angle of turn and distance between the loading and unloading points.
29