Hearth and Home Technologies BODBAY Chimney Requirements, Ovalizing Round Stainless Steel Liners

Page 7

BODEGA BAY WOOD INSERT

R

CHIMNEY REQUIREMENTS

A chimney must be the required height above the roof or other obstruction for safety and for proper draft oper- ation. The requirement is that the chimney must be at least 3 ft (91cm) higher than the highest point where it passes through the roof, and at least 2 ft (61cm) higher than the highest part of the roof or structure that is within10 ft (305cm) of the chimney, measured horizon- tally. Refer to Figure 7C.

OVALIZING ROUND STAINLESS STEEL

LINERS

Ovalizing round stainless steel liners to acommodate the liner passing through the damper region of a fire- place is an allowable and acceptable practice.

Ensure that the ovalization is minimized to the extent required to fit through the damper.

Figure 7A

Firestopping

Figure 7C

Non-Combustible

Firestopping

Material

2 inch (51mm)

Floor

(second Story)

Floor

Ceiling

Caulk

Minimum 1 inch (25mm) clearance from exterior chimney to sheathing

IMNEY HEIGHT

At least 3 ft

(91cm)

10 ft

(305cm)

At least 2 ft

(61cm)

Figure 7B

Minimum 2 inch (51mm) clearance from combustible material

and insulation

ceiling

Non-combustible fire stopping material

Figure 7D

CHIMNEY TOP VIEW

1/2" (12.7mm) airspace

FLUE

5/8" (16mm) Fireclay Flue Liner

Chimney Wall

4" (102mm)

Nominal

Foundation

August 20, 2008

435-1320B

Page

Image 7
Contents Bodbay Installation and Operation ModelImportant Safety Notes Advanced Combustion Technology ACTTest Lab Report No Manufactured Date Sample of Serial Number / Safety LabelBodega BAY Wood Insert Location On Beaded Chain, Left Side Behind Outer SkinTable of Contents Clearances to Combustibles TOP ViewSide View Front ViewListings Installation recommendationsChimney HEIGHT/DRAFT Alternate Floor Protection Worksheet General Installation ProcedureChimney TOP View Chimney RequirementsOvalizing Round Stainless Steel Liners Imney HeightInstallations Into Zero Clearance Fireplaces in Mobile Homes Masonry Fireplace Using DIRECT-CONNECT Method Installation OptionsFactory built zero clearance fireplace Usa installatons onlyLeveling Bolts and sheet metal shims Installation in CanadaMasonry and HEAT-CIRCULATING Securing Liner to Chimney Ring Outside AIR InstallationDoor Latch Adjustment Door Handle AssemblyPanel and Gold or Nickel Trim SET Blower Cord Location & Blower Control BOX with Switch Zero Clearance Adjustable Trim SUPPORT, 2 to Building a Fire OverfiringWood Selection and Storage Fan operating instructions Bodega BAY Wood Insert Operating TipsASH Removal Story of the Three Burning Stages Air quality and your Quadra-Fire InsertMaintenance Baffle Removal & Installation Brick replacement instructions PartCeramic Blanket Exploded ViewService Parts AccessoriesAppliance Warranty Policy Lifetime WarrantyBodega Bay Wood Insert