Echo ES-250 specifications Assembly, Blower Application, Install Blower Pipes

Page 12

ASSEMBLY

ES-250

 

 

ASSEMBLY

Blower Application

Never perform maintenance or assembly procedures with engine running or serious personal injury may result.

Install Blower Pipes

1. Stand unit upright on blower base.

2.Align locking ribs (A) on upper blower pipe with recesses (B) in fan case. Assure short locking rib (C) faces downward. Slide upper blower pipe into fan case until a clicking sound is heard.

3.Align tabs (D) with grooves (E) and slide lower blower pipe over upper pipe until there is light resistance. Do not force connection.

4.Hold upper pipe, and turn lower pipe clockwise, engaging positive locking channels until connection is firm. Do not force connection.

Note: Blower use will eventually loosen pipe connections. Exclusive positive locking system allows pipes to be tightened. If loosening occurs, remove lower straight pipe, and install according to instructions 3 & 4.

12

B

A

C

Blower Pipe Upper

E

D

Blower Pipe Lower

X7501182803

© 03/2013 ECHO Inc.

Image 12
Contents Operator’s Manual Burn HazardTable of Contents Introduction Servicing InformationSafety Manual Safety Symbols and Important InformationInternational Symbols Personal Condition and Safety Equipment Vibration and Cold Repetitive Stress InjuriesEquipment Emission Control Exhaust & Evaporative EPA 2010 and Later and/or C.A.R.B. TierProduct Emission Durability Emission Compliance Period Description Description Contents Assembly Install Blower PipesBlower Application Install Vacuum Tube Install BagRemove Blower Pipes Vacuum/Shredding ApplicationX7501182803 Operation FuelFuel Requirements Handling FuelStarting Cold Engine After useStarting Warm Engine Throttle TriggerStopping Engine Operating BlowerRead the Safety Section carefully Shred ‘ N’ VAC OperationShred ‘ N’ VAC Troubleshooting Problem Cause RemedyMaintenance Maintenance IntervalsSkill Levels Air Filter Fuel FilterCleaning Grill Spark PlugCooling System Cleaning Cylinder Fins Exhaust Port CleaningExhaust System Spark Arrestor ScreenCarburetor Adjustment Engine Break-InHigh Altitude Operation Shredder Blade Debris BagTroubleshooting Engine Problem Troubleshooting ChartStorage Long Term Storage Over 30 DaysSpecifications ModelWarranty Statements OWNER’S ResponsibilityWarranty Statements ES-250 ES-250 ES-250 ES-250