Echo ES-250 specifications Starting Warm Engine, Throttle Trigger

Page 17

ES-250

OPERATION

 

 

Move stop switch (A) away from the STOP position.

2. Throttle Position Lever

A

 

Move throttle position lever (B) midway between idle and full

 

throttle positions.

 

3.

Choke

 

 

Move choke (C) to Cold Start (

) (closed) position.

4.

Purge Bulb

 

 

Pump purge bulb (D) until fuel is visible and flows freely in the

 

clear fuel tank return line.

 

 

 

 

 

 

 

Recoil starter: Use short pulls - only 1/2 ~ 2/3 of rope for starting. Do not allow the rope to snap back in. Always hold the unit firmly.

5.Recoil Starter

Place the unit on a flat, clear area. Firmly grasp throttle grip with left hand and rapidly pull recoil starter handle/rope (E) until engine fires , or maximum 5 pulls.

6.Choke

Move choke lever (C) to Run position, and if necessary, restart engine.

Note: If engine does not start with choke in “Run” position after 5 pulls, repeat instructions 3 - 6.

7.Throttle Trigger

B

C

E

D

After engine warm up, gradually depress throttle trigger to increase engine RPM to operating speed.

Note: Allow engine to warm up 3 minutes before use.

Starting Warm Engine

The starting procedure is the same as Cold Start except DO NOT close the choke.

1.Stop Switch

Move stop switch (A) away from the STOP position.

2.Throttle Position Lever

Move throttle position lever (B) midway between idle and full throttle positions.

A

B

X7501182803

17

© 03/2013 ECHO Inc.

Image 17
Contents Burn Hazard Operator’s ManualTable of Contents Servicing Information IntroductionInternational Symbols SafetyManual Safety Symbols and Important Information Personal Condition and Safety Equipment Repetitive Stress Injuries Vibration and ColdEquipment Product Emission Durability Emission Compliance Period Emission Control Exhaust & EvaporativeEPA 2010 and Later and/or C.A.R.B. Tier Description Description Contents Blower Application AssemblyInstall Blower Pipes Install Bag Install Vacuum TubeRemove Blower Pipes Vacuum/Shredding ApplicationX7501182803 Fuel OperationFuel Requirements Handling FuelAfter use Starting Cold EngineThrottle Trigger Starting Warm EngineOperating Blower Stopping EngineShred ‘ N’ VAC Operation Read the Safety Section carefullyProblem Cause Remedy Shred ‘ N’ VAC TroubleshootingSkill Levels MaintenanceMaintenance Intervals Fuel Filter Air FilterCooling System Cleaning GrillSpark Plug Exhaust Port Cleaning Cleaning Cylinder FinsExhaust System Spark Arrestor ScreenHigh Altitude Operation Carburetor AdjustmentEngine Break-In Debris Bag Shredder BladeEngine Problem Troubleshooting Chart TroubleshootingLong Term Storage Over 30 Days StorageModel SpecificationsOWNER’S Responsibility Warranty StatementsWarranty Statements ES-250 ES-250 ES-250 ES-250