Husqvarna PZ7234FX / 966061401, PZ6034FX / 966516801, PZ6029PFX / 966062201 115 254426 R2 09/21/09

Page 80

P/N 115 254426 R2

09/21/09

Image 80
Contents Operator Manual Page Contents Page Introduction Good Service Manufacturing NumberSymbols and decals Manual Performing any General Operation SafetySafety Instructions Never take passengers Personal Safety Equipment Slope OperationChildren Safe Handling of Gasoline Safe Handling of Propane General Maintenance Risk of sparking Transport Rollover Protection System Rops Spark ArrestorsControls Control LocationsGas Engine EngineMotion Control Levers Hour Meter Tracking KnobParking Brake Blade SwitchIgnition Switch Ignition switch RUN position Cutting Height Pedals FusesChoke Control Seat Adjustment Lever Fuel Shut Off ValveRefueling Propane Model Steering OperationTraining Roll Bar and Safety Belt Before StartingStarting the Engine Gasoline engines only Turn fuel shut off valve counter clockwise to open Push choke in after starting To remove cables, reverse order Weak BatteryJumper Cables Running Ensure that no one is near mower when engaging blade switch Operating on HillsStopping the Engine Mowing Tips Manual Transport Maintenance Maintenance For replacing BatteryFor cleaning Safety System Fuel FilterTire Pressures Gasoline Engines OnlyParking brake adjustment Neutral Adjustments Deck Belt Removal Deck Belt InstallationDeck Belt Belt Installation Pump BeltBelts Replacing Pump BeltCutting Blades Adjusting the Mower Deck Leveling DeckAnti-scalp Rollers Deck Lift SpringCleaning Removal and InstallationUse protective glasses when cleaning and washing Caster WheelsGeneral LubricationLubrication Schedule Wheel and Deck Zerks CablesFront Wheel Mount Front Wheel BearingsHydraulic Drive Fluid ChangePurging Procedures Troubleshooting guide Problem CauseTroubleshooting guide Winter Storage ServiceStorage Wiring Diagram Transmission Technical DataPZ 5426FX PZ6030CV Engine Dimension PZ 5426FX PZ6030CV FramePZ6029FX PZ7234FX Engine PZ6029FX PZ7234FX Frame PZ6029PFX PZ6034FX Engine FX801V LPPZ6029PFX PZ6034FX Frame Torque Specifications Hex Head Cap ScrewsStandard Hardware Metric Standard HardwareUSA requirements CE requirementsService Journal Delivery ServiceAction Stamp, signAfter 10 hours Date, mtr reading Stamp, signDaily Service Hour Service Service Journal Service Journal At least once each year Action Date, mtr reading Stamp, sign Service Journal Service Journal Service Journal Page 115 254426 R2 09/21/09