Husqvarna Z4219, Z4824, Z5426, Z4218 manual Front-to-back adjustment

Page 50

MAINTENANCE

Front-to-back adjustment

IMPORTANT INFORMATION

Deck must be leveled side-to-side, prior to leveling front to back. If the following front to back adjustment is required, be sure to adjust both front and rear linkages equally so the deck will stay level side to side.

To obtain the best cutting performance, the deck should be adjusted so the front tip of the blades are approximately 1/8" (3.2 mm) to 1/4" (6.5 mm) lower than the rear tip. If the front tip is higher, this will create a poor quality of cut.

WARNING!

Blades are sharp. Protect your hands with gloves and/or wrap blades with a heavy cloth when handling.

1.Check blade height with blade facing front to rear. Measure distance “B” at the front and rear tip of the blade.

2.Before making any necessary adjustments, check to make sure that the deck is level side-to-side. See “Side to Side Adjustment” in Maintenance section.

3.With the deck in the 4” (100 mm) cutting position, measure the front and rear tip of each blade while facing front to rear.

4.To adjust, loosen the jam nut on the yoke, remove the securing ring and push the clevis pin out while supporting the deck. To lower that specific corner, lengthen the rod assembly by turning the yoke counter clockwise. To raise that specific corner, shorten the rod assembly by turning the yoke clockwise.

5.Reinstall clevis pin and recheck dimension.

6.Once front to back adjustment is correct, reinstall securing rings and secure jam nuts.

CZ-19

Front to back adjustment

8011-497

Rear lift linkage

English-48

Image 50
Contents Operator´s manual Page Contents OPERATOR’S Manual Rider SeriesEnglish-2 Introduction IntroductionGood Service Manufacturing NumberXxxx xxxxxx Symbols and DecalsSymbols and Decals Objects Engine is Running Moving sharp blades under cover General Operation Safety InstructionsSafety Instructions English-8 Personal Safety Equipment Slope OperationChildren Maintenance General Maintenance Risk of sparking Transport Important InformationCustomer responsibilities Control Locations ControlsControls Motion Control Levers TrackingSeat adjustment knobs FusesBy pass linkages Blade switch RefuelingThrottle Control Ignition SwitchChoke Control Machine must be stopped before activating the parking brake Hour MeterParking Brake Accessories Cutting height pedalTraining OperationOperation Before Starting Starting the EngineDepress the control for disengaging the mower deck Press in and turn the ignition key to the start position To start an engine with a weak battery To remove cables, reverse orderRunning Operating on hills Mowing Tips Stopping the Engine Moving by Hand Maintenance Schedule MaintenanceMaintenance = Described in this manual  = Not described in this manual Replacing battery BatteryTo clean battery and terminals Always use protective glasses when handling the batteryIgnition System Checking the Safety System Checking and Adjusting Throttle Cable Checking the Engines Cooling Air IntakeReplacing the Air Filter Briggs and Stratton engineChecking Tire Pressures Faulty adjustment can cause an accidentReplacing the Fuel Filter Checking the Parking BrakeChecking the V-belts Deck beltDeck belt installation EZT belt removal EZT beltTo replace EZT E-Series Zeroturn Transaxle belt Checking the Blades Check the bladesAdjusting the Mower Deck Side-to-side adjustment To level deckFront-to-back adjustment To adjust anti-scalp rollers Caster Wheels Cleaning and WashingUse protective glasses when cleaning and washing HardwareLubrication Schedule LubricationLubrication Caster wheels Lubricating the CablesLubricating in Accordance with the Lubrication Schedule Engine Oil Briggs & Stratton Changing the Engine OilOil drain valve Checking the oil level Changing the Oil FilterTransmission Problem Cause Trouble Shooting GuideTrouble Shooting Guide Wrong fuel type English-58 Storage ServiceStorage Winter StorageWiring Diagrams Wiring diagramZ4218 Z4219 Technical DataTechnical DataTechnical Data Equipment Z4824 Z5426 English-64 Torque Specifications USA requirements Conformity CertificatesConformity Certificates Delivery Service Service JournalService Journal Action Date, mtr reading, stamp, signAfter the First 5-8 Hours Hour Service English-70 English-71 English-72 At Least Once Each Year English-74 English-75 English-76 Page 113926Rir06/05/06