Toshiba RAV-SP560AT-E manuals
Household Appliance > Air Conditioner
When we buy new device such as Toshiba RAV-SP560AT-E we often through away most of the documentation but the warranty.
Very often issues with Toshiba RAV-SP560AT-E begin only after the warranty period ends and you may want to find how to repair it or just do some service work.
Even oftener it is hard to remember what does each function in Air Conditioner Toshiba RAV-SP560AT-E is responsible for and what options to choose for expected result.
Fortunately you can find all manuals for Air Conditioner on our side using links below.
Toshiba RAV-SP560AT-E Service Manual
31 pages 417.89 Kb
FILE NO. A03-013 SERVICE MANUAL<OWNERS MANUAL/INSTALLATION MANUAL> SPLIT TYPE RAV-SP1100UT-E RAV-SP560AT-E, RAV-SP800AT-E RAV-SP1100AT-E, RAV-SP1400AT-ER410A 4 PRECAUTIONS FOR SAFETYCAUTION WARNING37If refrig erant gas has leaked during the installation work, ventilate the room immediately. After the installation work, confirm that refrigerant gas does not leak. Conform to the regulations of the local electric company when wiring the power supply. Required tools for installation work R410A (Special requirement) 5 ACCESSORY AND REFRIGERANTAccessory and Installation Parts Refrigerant Piping 6 SELECTION OF INSTALLATION<SM800AT-E> * *<SP800AT-E> <SP560AT-E, SP800AT-E only> Air purge Electrical cabling Before installationLength of refrigerant pipe <SM560AT-E> 39 7 Necessary Space for InstallationObstacle at rear side<Obstacle also at the upper side> Obstacle at front side Installation Place40 <Obstacle also at the upper side> Obstacles at both front and rear sides Serial installation at front and rear sides 8 Installation of Outdoor Unit<SM800AT-E, SP560AT-E, SP800AT-E> 41 9 Optional Installation Parts (Local Procure)Refrigerant Piping ConnectionTAKE NOTICE THESE IMPORTANT 4 POINTS BELOW FOR PIPING WORK <Piping connection> For Reference 10 Knockout of Pipe CoverKnockout procedure How to remove the front panel 43 11 REFRIGERANT PIPINGPipe Forming/End PositioningFlaring Flaring size : A (Unit : mm) Projection margin in flaring : B (Unit : mm) 44 Tightening of Connecting PartSM800 type valve at gas side Do not apply refrigerating machine oil to the flared surface. 12 REFRIGERANT PIPING REQUIREMENT13 EVACUATINGAir PurgeVacuum pump 46Valve rod Valve unit Flare nut Stopper Charge port Charge cap How to open the valveHandle position Valve handling precautions 14 EVACUATING6.4 Valve size 9.5 12.7 15.9 Charge port 47 15 ELECTRICAL WORKStripping length power cor d and connecting cable How to remove the valve cover 48 16 FINAL INSTALLATION CHECKSCheck and Test Operation *Self-Diagnosis by LED IndicationLED indication and code checking ll l l lll l l ll ll l Useful Functions (SM800AT-E, SP560AT-E, SP800AT-E) 18 PRECAUTIONS FOR SAFETYCAUTION WARNING51If refrig erant gas has leaked during the installation work, ventilate the room immediately. After the installation work, confirm that refrigerant gas does not leak. Conform to the regulations of the local electric company when wiring the power supply. Required tools for installation work R410A (Special requirement) 19 ACCESSORY AND REFRIGERANTAccessory and Installation Parts Refrigerant Piping 20 SELECTION OF INSTALLATIONBefore installation *Length of refrigerant pipe <SM1100AT-E, SM1400AT-E> <SP1100AT-E, SP1400AT-E only> <SP1100AT-E, SP1400AT-E> Air purge Electrical cabling ( )53 21 Necessary Space for InstallationObstacle at rear side<Obstacle also at the upper side> Obstacle at front side Installation Place54 <Obstacle also at the upper side>Drain nipple Waterproof rubber cap Obstacles at both front and rear sides Serial installation at front and rear sides 22 Installation of Outdoor Unit23 Refrigerant Piping Connection<Piping connection> TAKE NOTICE THESE IMPORTANT 4 POINTS BELOW FOR PIPING WORK For Reference Optional Installation Parts (Local Procure) Knockout of Pipe CoverKnockout procedure 56 How to remove the front panel Flaring size : A (Unit : mm) Pipe Forming/End Positioning 24 REFRIGERANT PIPINGProjection margin in flaring : B (Unit : mm) 57 Tightening of Connecting PartValve at gas side Do not apply refrigerating machine oil to the flared surface. 25 REQUIREMENTREFRIGERANT PIPING 26 EVACUATINGAir PurgeVacuum pump 27 59How to open the valveHandle position Valve handling precautions 60 28 ELECTRICAL WORKStripping length power cor d and connecting cable How to wire 29 FINAL INSTALLATION CHECKS
Also you can find more Toshiba manuals or manuals for other Household Appliance.