Pre-installation Requirements
1
-
13
Pre-installation Requirements
Before you install the Bridge/Router Module into the AccessBuilder
7000 Access Concentrator chassis, check that the following
requirements have been met:
The AccessBuilder 7000 Access Concentrator must already be fitted
with its power supply module(s) and the Management Controller
Module if required.
The rack unit into which you install the AccessBuilder 7000 must allow
for the door to be fully opened to remove existing modules or to install
new modules. During normal operation the door must remain closed.
The BRI Bridge/Router Module is two slots wide. You need two free
slots in the chassis to install the module.
You have suitable cables for connection to your LAN, WAN and ISDN
ports. Pin-outs for the cables required can be found in
AppendixA
A transceiver connected to your network cabling and AUI cable if the
10Base5 connector is to be used.
A standard ISDN line wall socket to connect the ISDN cable to the ISDN
port of the BRI Bridge/Router module. If a suitably sited wall socket is
not already available, then contact your telecommunications supplier
for assistance.
The ISDN telephone number of the remote ISDN unit in order to carry
out the connection configuration procedure.