3Com manual Installing The Hub, SuperStack II Hub 1000 SX User Guide

Models: Hub 1000 SX

1 70
Download 70 pages 54.81 Kb
Page 17
Image 17
INSTALLING THE HUB

2

INSTALLING THE HUB

This chapter describes the Hub 1000 SX package contents and provides installation procedures for the hub and for optional GBIC modules and power systems.

No configuration is required to install and use the hub.

Safety Precautions To avoid personal injury or damage to the Hub 1000 SX unit, observe the following safety precautions:

WARNING: Do not perform any maintenance on the hub while it is still connected to a power source.

WARNING: Remove all jewelry from your hands and wrists before installing the hub. Use insulated or nonconductive tools.

CAUTION: Power for the unit must be supplied by a grounded power source. The hub should never be connected to an ungrounded AC outlet or power supply.

Package Contents Remove the hub from the shipping package and verify that you have received these items in good condition:

Hub 1000 SX unit

Rack mounting kit containing two brackets and four screws

Four rubber feet for desktop placement

AC power cord

SuperStack II Hub 1000 SX User Guide

Inspect each item for damage. If you find a problem, contact the network supplier and the carrier that delivered the package.

Page 17
Image 17
3Com manual Installing The Hub, SuperStack II Hub 1000 SX User Guide