Figure 2-1 – 200a Frame Set-Up
11.Check for free action of both upper and lower taping heads.
WARNING – Keep hands/fingers away from tape
orange knife guard. Knife is extremely sharp and can cause severe injury.
Push buffing roller into head to check for free, smooth action of taping heads.
12.Loosen lock knobs and pivot side guides to center position. Install machine stops (from parts box) as shown in Figure
[2 inch] tape legs.)
13.Ensure that the tape drum bracket assembly, located on the lower taping head, is mounted straight down, as shown in Figure
14.Use appropriate material handling equipment to remove the machine from the pallet and move it into position.
Whenever the machine is lifted with a fork truck, insure that the forks span completely across the machine frame and do not contact any wiring or mechanism under the machine frame. In some cases the lower taping head may need to be removed to avoid damage.
CAUTION – Machine weighs approximately 123 kg [280 pounds]
uncrated.
15.Continue with the remainder of the Installation and
10