3M 1 - 200a Frame Set-Up, CAUTION - Machine weighs approximately 123 kg 280 pounds uncrated

Models: 200a

1 62
Download 62 pages 54.72 Kb
Page 15
Image 15
Figure 2-1 – 200a Frame Set-Up

Figure 2-1 – 200a Frame Set-Up

11.Check for free action of both upper and lower taping heads.

WARNING – Keep hands/fingers away from tape cut-off knife under

orange knife guard. Knife is extremely sharp and can cause severe injury.

Push buffing roller into head to check for free, smooth action of taping heads.

12.Loosen lock knobs and pivot side guides to center position. Install machine stops (from parts box) as shown in Figure 2-1D. Use the lowest hole position and bolt into the lowest threaded insert on the column. (The upper hole position in the stops are only used when the taping heads are adjusted to apply 50 mm

[2 inch] tape legs.)

13.Ensure that the tape drum bracket assembly, located on the lower taping head, is mounted straight down, as shown in Figure 2-2A. The tape drum bracket assembly can be pivoted to provide tape roll clearance in certain cases.

14.Use appropriate material handling equipment to remove the machine from the pallet and move it into position.

Whenever the machine is lifted with a fork truck, insure that the forks span completely across the machine frame and do not contact any wiring or mechanism under the machine frame. In some cases the lower taping head may need to be removed to avoid damage.

CAUTION – Machine weighs approximately 123 kg [280 pounds]

uncrated.

15.Continue with the remainder of the Installation and Set-Up procedure through page 12.

10

Page 15
Image 15
3M manual 1 - 200a Frame Set-Up, CAUTION - Machine weighs approximately 123 kg 280 pounds uncrated