3M 200a manual Installation and Set-Up Continued

Models: 200a

1 62
Download 62 pages 54.72 Kb
Page 16
Image 16
Installation and Set-Up (Continued)

Installation and Set-Up (Continued)

MACHINE BED HEIGHT

Adjust machine bed height. The case sealer is equipped with four adjustable legs that are located at the corners of the machine frame. The legs can be adjusted to obtain different machine bed heights from 610 mm [24 in] minimum to 890 mm [35 in] maximum.

Note – Minimum machine bed height can be reduced to 520 mm [20.5 in] by moving outer columns up one set of mounting holes.

However, this change also reduces minimum box height of 120 mm [4.75 in] to 165 mm [6.5 in]. (See "Special Set-Up Procedure – Box/Machine Bed Height Range", page 24.)

Refer to Figure 2-2C and set the machine bed height as follows:

1.Use appropriate material handling equipment and blocking techniques to raise the machine frame to allow adequate leg adjustment.

2.Loosen, but do not remove, two M8 x 16 socket head screws in one leg (use M6 hex wrench). Adjust the leg length for the desired machine bed height. Retighten the two screws to secure the leg. Adjust all four legs equally.

OUTBOARD TAPE ROLL MOUNTING (Lower Taping Head Alternate Position)

Remove the tape drum bracket assembly, spacer and fasteners from the lower taping head. Install and secure on the infeed end of the lower frame, as shown in Figure 2-2B.

TAPE LEG LENGTH

Taping heads are pre-set to apply 70 mm [2.75 in] long tape legs. To change tape leg length to 50 mm [2.0 in], see "Special Set-Up Procedure – Changing the Tape Leg Length", page 23.

Figure 2-2 – Machine Bed Height Adjustment and Lower Tape Drum Bracket Position

11

Page 16
Image 16
3M 200a manual Installation and Set-Up Continued