12
Installation and Set-Up (Continued)
ELECTRICAL CONNECTION AND CONTROLS
The electrical control box, located on the lower
right side of the machine frame, contains the
pre-set circuit breaker. The control box can be
located on the opposite side of the machine
frame if desired. A standard three conductor
power cord with plug is provided at the back of
the electrical control box for 115 Volt, 60 Hz, 6.4
Amp electrical service. The receptacle
providing this service shall be properly
grounded. Before the power cord is plugged
into 115 Volt, 60 Hz outlet make sure the red
"Off" button is depressed and that all packaging
materials and tools are removed from the
machine. Do not plug electrical cord into
outlet until ready to run machine.
Note – Machines outside the U.S. may be
equipped with 220/240 Volt, 50 Hz systems
or other electrical requirements compatible
with local practice.
INITIAL START-UP OF CASE SEALER
After completing the "Installation and Set-Up"
procedure, continue through "Operation" for
tape loading and start-up to be sure case sealer
is properly adjusted to run boxes.
PNEUMATIC CONNECTION
The case sealer requires a 6.5 bar gauge
pressure [95 PSIG], 110 litre/min @ 21° C,
1.01 bar [3.75 SCFM] compressed air supply.
Using customer supplied air hose (8 mm [.31 in]
I.D.) and clamp provided with machine, connect
plant air to barbed fitting on inlet side of
"On/Off" valve. See Figure 2-2.
Note: If
another type of connector is desired, the barbed
fitting can be replaced with the desired 1/4-18
NPT connector.
WARNING – Use care when working
with compressed air.
Note – The air valve has provisions for lock
out/tag out according to plant regulations.
Figure 2-2 – Pneumatic Connection