29
Special Set-Up Procedure (Continued)
TAPING HEADS
4. Lift the lower taping head, shown in Figure 6-3 and 6-1C, straight up to remove it from the case sealer bed.
5. Refer to Section II, "Adjustments – Changing Tape Leg Length," for taping head set-up.
6. Replace taping heads reverse of disassembly. Turn on air supply and electric power, unlatch upper drive
assembly and allow it to return to its rest position.
With upper drive assembly in raised position:
1. Remove tape from upper taping head.
2. Pivot up the clamp that secures the upper taping head as shown in Figure 6-1B.
3. Hold upper taping head applying and buffing arms from under upper assembly, slide head forward and down
to remove. See Figure 6-2.
Figure 6-2 – Remove Upper Taping Head Figure 6-3 – Remove Lower Taping Head
To reduce the risk associated with sharp blade hazards:
Keep hands and fingers away from tape cutoff blades under orange blade guards. The blades are
extremely sharp
WARNING
To reduce the risk associated with muscle strain:
Use proper body mechanics when removing or installing taping heads that are moderately heavy or may
be considered awkward to lift
WARNING
To reduce the risk associated with mechanical and electrical hazards:
Turn electrical and air supply off and disconnect before performing any adjustments, maintenance or
servicing the machine or taping heads
WARNING