5.0 PREPARATION

5.1SETTING UP THE BALANCE

CAUTION

Avoid installing the balance in direct sunlight that may cause poor performance or malfunctions.

Place the balance on a firm weighing table so that the balance is levelled. The balance will not perform accurately when it is not levelled.

Level by adjusting the feet to centre the bubble in the spirit level.

Remove the shipping protection screw and round cover as shown below using the Allen key supplied in the box. (It is advisable to keep the shipping protection screw and the round cover along with the packing box for using during shipping to another location in future).

Shipping protection screw

Round cover around the screw

Place the platform (comes separately packed) in the receptacles on the top cover. Place the stainless steel pan. (See the diagram on page 5).

Do not press with excessive force as it could damage the load cell inside.

Place the balance on a firm and flat surface for accurate weighing.

5.2INSTALLING BATTERIES AND POWER

Remove the battery compartment cover and insert six batteries (R6P/LR6 /AA size) into the battery compartment. Take extreme care in placing the positive and negative polarities correctly.

Alternately, plug in the AC adapter into the socket at the rear of the balance. The AC input requirement could be 100, 120, 220, 230 or 240 Volts (50/60Hz) depending on the location where it is used. Verify the adapter is correct.