ADC AD-310 service manual Second Visual Check

Models: AD-310

1 119
Download 119 pages 59.94 Kb
Page 42
Image 42

e. Troubleshooting Flow Chart - Quick Reference...

 

 

 

 

 

 

 

Second Visual Check

 

 

 

 

 

 

 

(Does Main Burner Ignite?)

 

Does

 

 

 

Is manual

 

 

 

 

knob on the Gas Valve

main burner

 

 

 

 

No

 

 

 

in the "ON"

 

light?

 

 

 

 

 

 

 

position?

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Yes

 

 

 

 

 

Yes

 

 

 

 

 

 

 

 

 

 

 

 

Turn knob to "ON/OPEN" position.

No Energize system and check for proper operation.

Go To

Third Visual

Check

Restore gas supply. Energize system and

check for proper operation.

No

Is

dryer Internal Gas Shut-Off Valve and

ALL External Gas Shut-Off

Valves in the open

position?

Yes

Turn manual knob on the Gas Valve to the "OFF" position.

Connect a manometer to the Gas Valve outlet pressure tap.

No

Correct supply pressure. Energize system and check for proper operation .

No

Is

gas available

at the

source?

Yes

Energize

system. Is 24 VAC present across leads at the Gas

Valve?

 

 

Turn

 

 

 

 

manual knob on

 

 

 

 

the Gas Valve to the

 

 

 

 

"ON" position.

 

Yes

No

 

 

 

 

 

 

Energize the system.

 

 

 

 

 

 

 

Is outlet pressure

 

 

 

 

detected?

 

 

 

 

 

With

 

 

system energized,

 

 

is 24 VAC present

 

 

No

 

 

 

across the "MV" and "GND"

 

 

 

terminals of the DSI

 

 

 

Module?

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

No

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Yes

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Is outlet Water

Column (W.C.) pressure

correct?

Natural 3.5" - 4.0" W.C. L.P. 10.5" - 11.0" W.C .

Yes

Check Spark Electrode for proper gap and insure that the spark is in the path of the gas flow...

Refer To Service Section.

Yes

Replace the Gas Valve. Energize the system and check for proper operation.

 

 

Replace High

 

 

Replace

 

 

Voltage (HV)

 

 

DSI Module

 

 

leads

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Energize system

 

 

 

 

 

 

and check for

 

 

 

 

 

 

 

 

 

 

 

proper operation.

 

 

 

 

 

 

 

 

 

 

 

 

Make the necessary corrections. Energize system and check for proper operation.

3 8

Page 42
Image 42
ADC AD-310 service manual Second Visual Check