2 UNPACKING AND INSPECTION
Before starting the installation, always open the shipping boxes and verify that all parts have been received and that no shipping damage has occurred. Use the following procedure to unpack and inspect the fuse platform:
1.Open the shipping carton and carefully unpack the fuse platform from the protective packaging.
2.Check the panel for broken or missing parts. If there are any damages, contact ADC (see Section 8, Customer Information and Assistance on page 29 for an RMA (Return Material Authorization) and to reorder if replacement is required.
3 PRE-INSTALLATION
This section contains general installation recommendations, unpacking and inspection procedures, a list of tools and materials required, and continuity test procedures.
3.1General Installation Recommendations
The fuse platform should be installed in a central office, equipment room, or restricted access location. Observe the following guidelines when installing the fuse platform:
•Mount the fuse platform in the upper area of the rack or cabinet to reduce exposure of the power wiring. Provide a minimum of 1.75 inches (4.45 cm) of air space (one rack space) above and below the fuse platform to allow air to freely circulate.
•Be aware that adding a fuse platform to the rack may displace a device which may require relocation.
•Use common hand tools to install the fuse platform (see Section 3.2 below). The use of a power screwdriver to install the
3.2Installation Tools Required
The following tools are required to install the fuse platform:
•Phillips screwdrivers (#1 and #2)
•
•Torque screwdriver calibrated in
•Torque wrench calibrated in
•
•Wire cutter and wire stripper
•Compression lug crimper
•
•Multimeter
•Heat gun