3. Locate the C GND (chassis ground) studs at the rear of the panel as shown in Figure 15.
DETAIL DRAWING
OF GROUNDING
WIRE CONNECTION
TIGHTEN STUD NUT TO
23
(2.6 NEWTON METERS)
OF TORQUE
Figure 15. Chassis Ground Connections
4.Connect the ring terminal end of each wire to one of the studs and secure using the nuts with captive star washers provided (requires
5.Route the free end of each chassis grounding wire to an approved office ground source.
6.Cut each chassis grounding wire to length and connect it to the office ground source as required by local code or practice.
Page 20
© 2006, ADC Telecommunications, Inc.