Total Access 1224 Quad T1 IMA 24-Port DSLAM Installation and Maintenance Practice
3-4 61179621L1-5C
INSTALLATION STEPSThe following steps are required to install the Total Access 1224. Each step has an associated
procedure which is referenced below the step. Each procedure provides detailed information
for completing the step.
1. Mount the Total Access 1224 system with the appropriate hardware.
For detailed information, refer to “Mounting the Total Access 1224” on page 3-5.
2. Ground the Total Access 1224.
For detailed information, refer to “Ground Connection” on page 3-8.
3. Make the power connections to the Total Access 1224.
For detailed information, refer to “Power Connection” on page 3-9.
4. Connect the Ethernet cable to the Total Access 1224.
For detailed information, refer to “Ethernet Connection” on page 3-11.
5. Connect the DB-15 male alarm cable connector to the Total Access 1224 and wire-wrap
the connections to an alarm panel.
For detailed information, refer to “Alarm Connections” on page 3-12.
6. Connect the network cable.
For detailed information, refer to “Network Connections” on page 3-13.
7. Connect the ADSL2+ plus POTS and POTS cables.
For detailed information, refer to “ADSL2+ Plus POTS Connections” on page 3-14.
8. Turn-up the Total Access 1224.
For detailed information, refer to “Quick Turn-up Steps” on page 3-17.