2. Display
Menu Structure - Production Log - Continued |
|
| ||
Display Functions | Description |
|
| |
|
|
| ||
| Installed: | Date of first grid connection |
|
|
| Power down: 21:00:00 | When the inverter was last connected to grid |
|
|
|
| 2 | ||
| Prod. initiated: 06:00:00 | When the inverter first connected to grid today |
| |
|
| |||
| Total | Period of time the inverter has limited power production in total, shown in |
| |
| hours |
|
| |
|
|
|
| |
| Pwr level adjust: 0 h | Due to Power level adjustment |
|
|
| Freq. stabiliza.: 0 h | Due to frequency support |
|
|
| Reactive Power: 0 h | Due to reactive energy support |
|
|
Only visible if the current country setting is an MV country or custom, and in |
|
| ||
|
| Protect PV versions. |
|
|
|
|
|
| |
| 1000 000 VArh |
|
|
|
|
|
|
| |
| 1000 000 VArh |
|
|
|
|
|
| ||
| Latest event: | The latest event is displayed. The number is for service purposes |
|
|
0 | Zero indicates no error. |
|
| |
The latest 20 events are displayed |
|
| ||
1 : | Date and time of the event |
|
| |
| Grid 29 off | Group - ID - Status of the event |
|
|
| 2 : |
|
|
|
| Grid 29 on |
|
|
|
| - |
|
|
|
| 20: |
|
|
|
Table 2.6: Production Log - Continued
8000038784_00_BAL_en / | 9 |