TABLE OF CONTENTS

SAFETY SECTION

1-1

General Safety Instructions and Practices

1-2

Operator Safety Instructions and Practices

1-4

Equipment Operation Safety Instructions and Practices

1-5

Connecting or Disconnecting Implement Safety Instructions and Practices

1-12

Transporting Safety Instructions and Practices

1-13

Maintenance and Service Safety Instructions and Practices

1-14

Storage and Parking Safety Instructions and Practices

1-16

Concluding Safety Instructions and Practices

1-16

Decal Location

1-17

Decal Location

1-19

Federal Laws and Regulations

1-24

INTRODUCTION SECTION

2-1

ASSEMBLY AND CONNECTING THE LOADER SECTION

3-1

Assembly Instructions

3-2

Proper Ballasting and Wheel Spacing

3-4

Dismounting Loader and Mounting Loader to Tractor

3-5

Dismounting Loader

3-6

Mounting Loader

3-6

Installing Bucket Level Indicator

3-7

Attaching Pin on Bucket

3-8

Assembling Quick Attach Device

3-9

Installing Quick Attach Device

3-10

OPERATION SECTION

4-1

Standard Equipment and Specifications

4-3

Operator Requirements

4-4

Tractor Requirements

4-7

ROPS and Seat Belt

4-7

Tractor Lighting and SMV Emblem

4-7

Tractor Ballast

4-8

Getting On and Off the Tractor

4-8

Boarding the Tractor

4-9

Dismounting the Tractor

4-9

Starting the Tractor

4-10

Pre-Operation Inspection and Service

4-11

Tractor Pre-Operation Inspection/Service

4-12

Loader Pre-Operation Inspection and Service

4-12

Driving the Tractor and Loader

4-17

Driving the Tractor and Loader

4-18

Operating the Tractor and Loader

4-19

Operating the Loader

4-24

Operating Bale Spear

4-37

Shutting Down the Implement

4-38

Loader Storage

4-38

Transporting the Tractor and Implement

4-38

Transporting on Public Roadways

4-40

Page 3
Image 3
Alamo 3109 manual Table of Contents