Alamo 3109 manual Operation, Loader Boom Assembly, OPS-L-0007_B

Models: 3109

1 104
Download 104 pages 30.28 Kb
Page 60
Image 60
LOADER BOOM ASSEMBLY

OPERATION

OPERATION

LOADER BOOM ASSEMBLY

Inspect condition of each arm section weldment

Ensure all pins are in place.

Ensure all bolts and screws are properly installed.

Check condition of bushings at boom pivot points.

Ensure each hydraulic cylinder is installed and retained correctly. Ensure the proper size pins are used to retain the cylinders in place and are secured properly. OPS-L-0005_B

HYDRAULIC LINE INSPECTION

Check for hydraulic leaks along hoses, cylinders and fittings. IMPORTANT: DO NOT use your hands to check for oil leaks. Use a piece of heavy paper or cardboard to check for hydraulic oil leaks.

Inspect the condition of the valve weldment.

Ensure fitting is properly connected

Inspect condition of bushings. OPS-L-0018_B

BUCKET INSPECTION

Ensure all pins are in place.

Ensure each hydraulic cylinder is installed and retained correctly. Ensure the proper size pins are used to retain the cylinders in place and are secured properly.

Inspect the condition of the bucket lug weldments.

Inspect condition of bushings.

OPS-L-0007_B

OPS-L-0007_B Hydraulic Hoses

Manual background Bucket Pins

3109 01/11

Operation Section 4-14

© 2011 Alamo Group Inc.

Page 60
Image 60
Alamo 3109 manual Operation, Loader Boom Assembly, OPS-L-0007_B