OPERATION

Another method for large dirt piles is to build a ramp approach to the pile.

It is important to keep the bucket level when approaching a bank or pile. This will help prevent gouging the work area.

3109 01/11

Operation Section 4-31

© 2011 Alamo Group Inc.

OPERATION

Page 77
Image 77
Alamo 3109 manual Operation