Alamo 7191852C manual Boom Unit Pre-OperationInspection and Service, OPS-B-0020

Models: 7191852C

1 110
Download 110 pages 14.97 Kb
Page 67
Image 67
6.2 Boom Unit Pre-Operation Inspection and Service

OPERATION

6.2 Boom Unit Pre-Operation Inspection and Service

Inspect and service the boom arm and head prior to operation. Damaged and/or broken parts should be repaired and/or replaced immediately. To ensure the unit is ready for operation, conduct the following:

OPS-B- 0020

All Safety Shields, Guards and Safety devices including (but not limited to) - the Deflectors, Steel Guards, Gearbox Shields, PTO integral shields , and Retractable Door Shields should be used and maintained in good working

condition. All safety devices should be inspected carefully at least daily for missing or broken components. Missing, broken, or worn items must be replaced at once to reduce the possibility of injury or death from thrown objects, entanglement, or blade contact. (SFL-5)

Replace bent or broken blades with new blades. NEVER ATTEMPT TO STRAIGHTEN, WELD, OR WELD HARDFACING ON BLADES SINCE THIS WILL LIKELY CRACK OR OTHERWISE DAMAGE THE BLADE WITH SUBSEQUENT FAILURE AND POSSIBLE SERIOUS INJURY FROM THROWN BLADES. (SGM-10)

The operator’s manual and safety signs affixed on the unit contain important instructions on the safe and proper use of the equipment. Maintain these important safety features on the implement in good condition to ensure the information is available to the operator at all times.

Ensure the manual canister is secured to the equipment with the operator’s manual inside.

Ensure all safety signs are in place and legible. Replace missing, damaged, and illegible decals. OPS-U- 0011

NOTE: The mower Operator’s Manual and affixed Decals contain important instructions on the safe and proper use of the mower. Maintain these important safety features on the mower in good condition to ensure the information is available to the operator at all times.

KEEP AWAY FROM ROTATING ELEMENTS to prevent entanglement and possible serious injury or death. (SG-24)

PA91 02/08

Operation Section 4-15

© 2009 Alamo Group Inc.

OPERATION

Page 67
Image 67
Alamo 7191852C manual Boom Unit Pre-OperationInspection and Service, OPS-B-0020