OPERATION

OPERATION

FRAME ASSEMBLY

Inspect condition of mounting frame weldment.

Inspect condition of King Post frame.

Ensure all bolts and screws are in position and are properly torqued.

Ensure all pins are in place and fastened with screws.

Ensure frame is properly mounted to tractor and hardware is propely installed and tightened. OPS-B- 0021_D

BOOM ARM ASSEMBLY

Inspect condition of each arm section weldment

Ensure all pins are in place.

Ensure all bolts and screws are properly installed.

Check condition of teflon bushings at boom pivot points.

Ensure each hydraulic cylinder is installed and retained correctly. Ensure the proper size pins are used to retain the cylinders in place and are secured properly.

Ensure that all joints are lubricated. See Maintenance Section for Lubrication Chart. OPS-B-022_E

Never attempt to lubricate, adjust, or remove material from the Implement while it is in motion or while tractor engine is running. (SG-20)

HYDRAULIC LINE INSPECTION

Check for hydraulic leaks along hoses, cylinders and fittings. IMPORTANT: DO NOT use your hands to check for oil leaks. Use a piece of heavy paper or cardboard to check for hydraulic oil leaks.

Inspect the condition of the valve weldment.

Ensure fitting is properly connected

Inspect condition of nylon bushings.

OPS-B- 0023_E

PA91 02/08

Operation Section 4-16

© 2009 Alamo Group Inc.

Page 68
Image 68
Alamo 7191852C manual OPS-B- 0023E