Allied Telesis AT-GS950/48 manual Installation, Chapter

Models: AT-GS950/48

1 60
Download 60 pages 46.57 Kb
Page 29
Image 29

Chapter 2

Installation

This guide provides the hardware installation instructions for your AT-GS950/48 Gigabit Ethernet Smart switch as well as how to start a management session with the AT-S106 management software. This preface contains the following sections:“Reviewing Safety Precautions” on page 30

ˆ“Selecting a Site for the Switch” on page 32

ˆ“Cable Specifications” on page 33

ˆ“Unpacking the Switch” on page 34

ˆ“Installing the Switch on a Desktop” on page 35

ˆ“Installing the Switch on a Wall” on page 36

ˆ“Installing the Switch in a Rack” on page 39

ˆ“Installing an SFP Transceiver” on page 42

ˆ“Cabling and Powering On the Switch” on page 44

ˆ“Starting a Management Session” on page 47

29

Page 29
Image 29
Allied Telesis AT-GS950/48 manual Installation, Chapter