Allied Telesis AT-GS950/48 manual Positioning the Switch onto the Wall with Mounting Screws

Models: AT-GS950/48

1 60
Download 60 pages 46.57 Kb
Page 38
Image 38

Chapter 2: Installation

5.Position the switch on the wall and fasten with four screws, as illustrated in Figure 8 on page 38.

1764

Figure 8. Positioning the Switch onto the Wall with Mounting Screws

6.If you plan to install SFP transceiver modules, go to “Installing an SFP Transceiver” on page 42. Otherwise, your next step is “Cabling and Powering On the Switch” on page 44.

38

Page 38
Image 38
Allied Telesis AT-GS950/48 manual Positioning the Switch onto the Wall with Mounting Screws