AT-GS950/8POE Gigabit Ethernet WebSmart Switch Installation Guide

2.Remove the transceiver from its shipping container and store the packaging material in a safe location.

3.Position the transceiver with the label facing up.

4.Slide the transceiver into the slot until it clicks into place. See Figure 15.

8R

 

 

 

 

CLASS

1

 

LASER

 

 

 

PRO

 

 

 

DUCT

7

100/1000Base-X

 

 

 

 

8

 

 

 

1344

Figure 15. Installing an SFP Transceiver

5.Verify that the handle on the SFP transceiver is in the upright position, as shown in Figure 16, to prevent inadvertently removing the transceiver.

6.Remove the SFP cover as shown in Figure 16.

8R

7

CLASS

1

LASER

 

 

PRODUCT

100/1000Base-X

8

1345

SFP Handle SFP Handle

Figure 16. Removing the SFP Cover

51

Page 51
Image 51
Allied Telesis AT-GS950/8POE manual Removing the SFP Cover