Chapter 2: Installing the Hardware

AT-

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

GS950/8POE

8

Port

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

10/100/1000Mbps + 2

SFP

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Combo

WebSmart

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

PORT

 

Switch

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

ACTIVITY

 

 

 

RESET

POWER

 

 

 

 

 

 

 

 

 

 

ACT

 

 

 

 

 

 

 

1

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

2

3

 

 

 

 

 

 

 

 

 

 

1

POE

 

 

 

 

 

4

5

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

6

 

 

 

 

 

SFP

 

 

 

 

 

 

 

 

 

 

 

 

7R

8R

7

 

 

1000 LINK

 

 

3

 

 

 

 

 

 

 

 

 

 

 

 

 

8

100 LINK

ACT

 

4

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

ACT

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

5

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

6

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

7R

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

8R

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

LASECRLASS 1

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

PRODUCT

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

7

100/1000Base-X

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

8

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

1348

Figure 8. Attaching Rack-Mount Brackets

5.Install the second rack-mount bracket on the other side of the switch with the four remaining screws.

6.Mount the switch in a 19-inch rack using standard screws (not provided), as shown in Figure 9.

5

 

 

 

6

 

 

 

7R

 

 

 

8R

 

 

 

 

CLASS

1

 

LASER

 

 

 

PRODUCT

7

100/1000B

ase-X

 

 

 

 

 

 

8

 

 

 

1349

Figure 9. Mounting the Switch in a Rack

Note

For cabling information, see Chapter 3, “Cabling the Network Ports” on page 45.

40

Page 40
Image 40
Allied Telesis AT-GS950/8POE manual Ase-X