AT-GS950/8POE Gigabit Ethernet WebSmart Switch Installation Guide

Unpacking a Switch

To unpack a switch, perform the following procedure:

1. Remove all components from the shipping packages.

Note

Store the packaging material in a safe location. You must use the original shipping material if you need to return the unit to Allied Telesis.

2.Place the switch on a level, secure surface.

3.Make sure the following components are included in your switch package. If any item is missing or damaged, contact your Allied Telesis sales representative for assistance.

ˆOne AT-GS950/8POE Gigabit Ethernet WebSmart Switch

ˆTwo rack-mount brackets

ˆEight flathead Phillips rack-mount bracket screws

ˆFour #10-32 Phillips screws with nylon washers

ˆAC power cord (Americas, Australia, EU, Japan, and UK only)

ˆFour self-adhesive rubber feet

ˆDocumentation CD

37

Page 37
Image 37
Allied Telesis AT-GS950/8POE manual Unpacking a Switch