AT-MC606 VDSL Network Extender Installation Guide
39
3. Configure the right VDSL CONFIG switch (SCBR/PROV) to the SCBR
position as shown in Figure 13.
Figure 13. Configuring AT-MC606 Ethernet Extender for Provider Mode
4. Go to “Cabling the Provider Unit” on page 41 to connect the cables and
to “Powering On the Provider Unit” on page 41 for powering the unit.
Wall-Mountingthe Provider Unit
The AT-MC606 VDSL Network Extender may be wall mounted directly to
the wall with an AT-WLMT Wall Mount Bracket or by using an Allied
Telesis DINRAIL Bracket in conjunction with a previously mounted
DINRAIL. Both of these brackets may be ordered separately from the
AT-MC606. Please contact your local Allied Telesis representative.
1. Configure the right VDSL CONFIG switch (SCBR/PROV) to the SCBR
position as shown in Figure 13.
2. Follow the installation instructions supplied with the wall mounting
bracket or DINRAIL bracket.
3. To connect the cables, see “Cabling the Provider Unit” on page 41.
4. To apply power to the unit, see “Powering On the Provider Unit” on
page 41.
1935
ASYMFASTSCBR 6dB
SYM
INTL
PROV 9dB
VDSL CONFIG