Amana SPD26VW, SRD26VE Installation Checklist, Consumer Installer Doors, Leveling, Ice Maker

Models: SRD21VL SRD23VPE SRD21VE SRD23VW SRD26VL SBD21VPSE SBDE21VPE SBD21VW SRD23VE SQD26VW SRD26VPE SPD26VL SRD26VW SRD26VPSE SPD26VW SRD23VPSE SBD21VPE SRD23VL SRD21VW SBD21VE SBD21VL SBDE21VPSE SRD26VE

1 72
Download 72 pages 42.49 Kb
Page 8
Image 8
Installation Checklist

Installation Checklist

This checklist is for personal records only.

Consumer Installer

Doors

Doors are aligned with each other. (After food has been added to refrigerator , consumer should check door alignment).

Doors seal completely to refrigerator cabinet.

Handles are solidly attached to doors.

TouchmaticElectronic and Ice ‘N WaterDispenser Models

If doors were removed to install refrigerator, top hinge wire connectors are reconnected.

Leveling

Refrigerator is stable.

Toe grille is properly attached to refrigerator.

Ice Maker

Water supply to refrigerator is turned on.

Water leaks are not present at connection between household water supply and refrigerator. (After 24 hours, consumer should check connection for water leaks.)

Ice maker arm is in on position for ice production. (It may take up to 24 hours for first harvest of ice.)

Product Literature

Owner's manual is reviewed including the following information.

product registration card

Refrigerator and freezer controls

Chiller Freshsystem

Garden Freshcrispers

normal operating sounds

Water Filter (some models)

• Bypass cartridge is removed and water filter is installed

• Water leaks are not present around filter head

Notes

Consumer's Signature

Installer's Signature

Installer's Company Name/Phone Number

Date

8

Page 8
Image 8
Amana SPD26VW, SRD26VE, SBD21VL Installation Checklist, Consumer Installer Doors, Leveling, Ice Maker, Product Literature